Building a House Part 11: First Walkthrough Appointment with Construction Manager

The house just reached an important milestone! With the A/C and spray foam insulation now installed, we had our first walkthrough with the construction manager. 

We were given a detailed tour to get a feel of where everything was located such as the studs, electrical wiring, pipes, and etc. This is crucial to be informed as a homeowner to avoid making costly mistakes in the future when drilling or installing any fixtures (ex: drilling a hole into a pvc pipe or electrical wiring). We took plenty of pictures along with requesting the detailed blueprints of the house for future references.

Truly an unreal experience to see inside the house and the supporting structure.

Next up will be the installation of sheetrock, bricks, stone, and our trim exterior to take another step forward in bringing this house to life.